Zak Mir speaks with Andy Carroll, CEO of Mosman Oil & Gas, the company has commenced drilling its first exploration well. episode artwork

EPISODE · May 14, 2025 · 4 MIN

Zak Mir speaks with Andy Carroll, CEO of Mosman Oil & Gas, the company has commenced drilling its first exploration well.

from Share Talk LTD · host Share Talk LTD

Zak Mir talks to Andy Carroll, CEO of Mosman Oil & Gas, in the wake of today’s news that the helium, hydrogen, and hydrocarbon exploration, development, and production company has announced the spudding of the first exploration well of a five-well programme in the Vecta Project, Las Animas County, Colorado, US.Highlights·      | Drilling has commenced and surface casing set.·      | The Barclay-TH 295 106A well will test the Lyons Sandstone formation at the Billy Goat lease area (“AMI”), with a planned total depth (“TD”) of circa 800ft in the Lyons Sandstone.·      | Drilling will continue to determine top of Lyons formation, and then to TD.·      | Gas will be tested to determine concentrations of gases, including helium.·      | Wireline logging will be conducted at TD to determine the reservoir and gas/fluid properties.Vecta Project (90% interest in Billy Goat, 20% working interest in other areas)The Vecta Project is operated by Vecta and is located in Las Animas County, close to the Red Rocks helium producing field, and Blue Star Helium’s Galactica development project. Helium concentrations of up to 11% have been encountered in offset wells and fields in the area, with the closest well, Texaco Cynthia True-1, flowing 8.8% helium from the upper Lyons sandstone.A total of five wells are planned to be drilled in this drilling campaign, testing five individual structural closures.Andy Carroll, Chief Executive Officer of Mosman, said: “The drilling of this Billy Goat well is exciting given the excellent lease position in a proven area of helium development and production“Each well location has been carefully selected by the very experienced team at Vecta and we believe each well has an excellent chance of discovering helium. The low-cost drilling of these wells enables data to be obtained at very reasonable cost.“This location has good access to infrastructure including roads, pipelines and the Ladder Creek helium plant located at Cheyenne Wells, about 100 miles north of Billy Goat.”

Episode metadata supplied by the publisher feed · Published May 14, 2025

Embed this episode

Ready to play

Zak Mir speaks with Andy Carroll, CEO of Mosman Oil & Gas, the company has commenced drilling its first exploration well.

0:00 4:47

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Share Talk LTD?

This episode is 4 minutes long.

When was this Share Talk LTD episode published?

This episode was published on May 14, 2025.

Can I download this Share Talk LTD episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!