EPISODE · Dec 15, 2025 · 3 MIN
8 先行指标与滞后指标
from Hao的游戏PM笔记
在驾驶汽车时,你是通过挡风玻璃看前方,还是通过后视镜看后方?当然是前方。后视镜告诉你已经过去了什么,但你需要看前方才能知道接下来会发生什么。但在项目管理中,很多PM却只盯着"后视镜"——他们关注的指标告诉他们已经发生了什么,而不是即将发生什么。这一章,我们将学习如何建立"前车灯"——先行指标体系。🔗 延伸内容 [游戏项目管理进阶课程] [模拟面试 / 简历优化服务] [游戏 PM 成长社区(含工作思考与案例沉淀)]在小宇宙查看该单集文稿
Embed this episode
NOW PLAYING
8 先行指标与滞后指标
0:00
3:00
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Hao的游戏PM笔记?
This episode is 3 minutes long.
When was this Hao的游戏PM笔记 episode published?
This episode was published on December 15, 2025.
Can I download this Hao的游戏PM笔记 episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!