A.I. Data-Centers: Infrastructure for Control - Jim Duke Perspective episode artwork

EPISODE · Jun 18, 2026 · 41 MIN

A.I. Data-Centers: Infrastructure for Control - Jim Duke Perspective

from Fringe Radio Network · host Fringe Radio Network

Recent concerns have been raised over the data centers proposed for various states around the country. These centers house large databases for information on citizens, devices, equipment and government conrtol. Some fear this technology leads to mass-surveillance- but of course it will.

Episode metadata supplied by the publisher feed · Published Jun 18, 2026

Embed this episode

NOW PLAYING

A.I. Data-Centers: Infrastructure for Control - Jim Duke Perspective

0:00 41:36

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Fringe Radio Network?

This episode is 41 minutes long.

When was this Fringe Radio Network episode published?

This episode was published on June 18, 2026.

Can I download this Fringe Radio Network episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!