EPISODE · Jun 18, 2026 · 41 MIN
A.I. Data-Centers: Infrastructure for Control - Jim Duke Perspective
from Fringe Radio Network · host Fringe Radio Network
Recent concerns have been raised over the data centers proposed for various states around the country. These centers house large databases for information on citizens, devices, equipment and government conrtol. Some fear this technology leads to mass-surveillance- but of course it will.
Embed this episode
Ready to play
A.I. Data-Centers: Infrastructure for Control - Jim Duke Perspective
0:00
41:36
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of Fringe Radio Network?
This episode is 41 minutes long.
When was this Fringe Radio Network episode published?
This episode was published on June 18, 2026.
Can I download this Fringe Radio Network episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!