Alleviating loadshedding has a cost episode artwork

EPISODE · Jun 26, 2023 · 1 MIN

Alleviating loadshedding has a cost

from Die ekonomie minuut · host Waldo Krugell

The Department of Environmental Affairs recently gave permission for Eskom to operate three of Kusile's generation units without a flue-gas desulfurisation unit. With the predictions of high stages of loadshedding throughout the winter months, most of us surely feel that Kusile should be up and running - we can worry about clean air later. One understands the necessity of electricity supply and protection of the economy and jobs, but we must not think that it is without cost. This episode is supported by the Bureau for Economic Research in Stellenbosch and the NWU Business School.

Episode metadata supplied by the publisher feed · Published Jun 26, 2023

Embed this episode

NOW PLAYING

Alleviating loadshedding has a cost

0:00 1:51

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Die ekonomie minuut?

This episode is 1 minute long.

When was this Die ekonomie minuut episode published?

This episode was published on June 26, 2023.

Can I download this Die ekonomie minuut episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!