Bonus episode: All this is happening at Northvolt speed episode artwork

EPISODE · Jan 22, 2020 · 11 MIN

Bonus episode: All this is happening at Northvolt speed

from Stereo Chemistry

Late last year, C&EN contributing editor Mark Peplow toured a new battery company's R&D facility in Sweden. That company, called Northvolt, aims to produce the world's greenest lithium-ion batteries, to help meet the growing demand for electric vehicles. Ride along with Mark to learn more about the company, its work, and its goals in the first bonus episode of Stereo Chemistry. Check out Mark's full story for C&EN here: https://cen.acs.org/energy/energy-storage-/Northvolt-building-future-greener-batteries/97/i48  Image credit: Northvolt

Episode metadata supplied by the publisher feed · Published Jan 22, 2020

Embed this episode

Ready to play

Bonus episode: All this is happening at Northvolt speed

0:00 11:08

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Stereo Chemistry?

This episode is 11 minutes long.

When was this Stereo Chemistry episode published?

This episode was published on January 22, 2020.

Can I download this Stereo Chemistry episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!