Break It Down: Write A Great Work Breakdown Structure (with Emily Luijbregts from Siemens)
from The Digital Project Manager Hosted by Ben Aston - The Digital Project Manager
Discover how to reduce complexity and confusion by breaking down your projects into bite-sized pieces that everyone can understand.
Embed this episode
No transcript yet.
Similar podcasts
Frequently asked questions
How long is this episode of The Digital Project Manager?
This episode is 40 minutes long.
When was this The Digital Project Manager episode published?
This episode was published on July 25, 2020.
Can I download this The Digital Project Manager episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.