Datacenter Interconnects: Copper vs. Optics, Nvidia's 78-Layer PCB, Co-Packaged Optics (CPO) episode artwork

EPISODE · Jul 25, 2026 · 49 MIN

Datacenter Interconnects: Copper vs. Optics, Nvidia's 78-Layer PCB, Co-Packaged Optics (CPO)

from Semi Doped · host Vikram Sekar and Austin Lyons

Vik Sekar and Austin Lyons tackle the biggest bottleneck in inference: moving data. They break down the three tiers of datacenter networking — scale up, scale out, scale across — and the core engineering trade-off at each layer: copper vs. optics. Topics include Nvidia's extreme measures to keep scale-up fabric electrical (a 78-layer mid-plane PCB), why Co-Packaged Optics is the "holy grail" everyone wants and no one can ship, and the serviceability problem standing in its way.Key Takeaways:A single 72-GPU scale-up rack needs 5,000+ cables spanning ~2 km — at that density, the power and cost of every connection becomes a system-level constraint, not an implementation detail.The scale-up rule is "copper when you can, optics when you must": each pluggable optical module adds ~30W, and with thousands of links in the fabric, that penalty compounds fast.Nvidia is pushing copper past its usual limits with a 78-layer mid-plane PCB — 3x+ the layer count of a typical complex board — specifically to avoid paying the optics power tax in its scale-up fabric.Scale-up isn't just a training problem. Frontier MoE models need 72-GPU domains to hit memory bandwidth targets, which pulls high-performance interconnect into the inference conversation.Scale-up has the highest connection density of the three tiers, making it the largest TAM and the sharpest three-way fight between NVLink, UA-Link, and Ethernet.Co-Packaged Optics could cut interconnect power by two-thirds — but a single failed laser could brick an entire multi-thousand-dollar GPU package, and that serviceability risk is what's keeping it on the roadmap instead of in racks.Chapters: 0:00 The Biggest Problem in Computing 7:14 The Three Tiers of Networking 13:49 Scale Up: Copper vs. Optics 17:59 Front-End vs. Back-End Networks 22:12 The Physical Scale of Cabling 28:46 Nvidia's 78-Layer Mid-Plane 33:16 How Optical Transceivers Work 39:16 The Power Penalty of Pluggables 42:09 The Business of Speed Transitions 44:40 The Promise and Peril of CPO 51:45 The Holy Grail of NetworkingFollow Chipstrat: Newsletter: https://www.chipstrat.com X: https://x.com/austinsemisFollow Vik: Newsletter: https://www.viksnewsletter.com/ X: https://x.com/vikramskrFollow Semi Doped: Get more of Austin and Vik daily, free: https://daily.semidoped.com/

Episode metadata supplied by the publisher feed · Published Jul 25, 2026

Embed this episode

Vik Sekar and Austin Lyons tackle the biggest bottleneck in inference: moving data. They break down the three tiers of datacenter networking — scale up, scale out, scale across — and the core engineering trade-off at each layer: copper vs. optics. Topics include Nvidia's extreme measures to keep scale-up fabric electrical (a 78-layer mid-plane PCB), why Co-Packaged Optics is the "holy grail" everyone wants and no one can ship, and the serviceability problem standing in its way. Key Takeaways:...

Distinct summary based on available episode metadata or transcript content.

NOW PLAYING

Datacenter Interconnects: Copper vs. Optics, Nvidia's 78-Layer PCB, Co-Packaged Optics (CPO)

0:00 49:11

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Semi Doped?

This episode is 49 minutes long.

When was this Semi Doped episode published?

This episode was published on July 25, 2026.

Can I download this Semi Doped episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!