Dry Pipe & Preaction Systems | MN Journeyman Exam Prep
from MN Journeyman Sprinkler Fitter Exam Prep Hosted by CaseyJames669
Dry pipe and preaction systems (plus a little deluge), every rule a Minnesota journeyman sprinkler fitter needs for the exam. NFPA 13 (2016, the edition Minnesota pins, side by side with 2019, with 2025 checks): where dry systems belong, Minnesota's flammable-liquid storage rule (wet, deluge or preaction only, Minn. R. 7511.5704) and the compact-storage ban on dry and double interlock. Dry valve rooms: lighted, heated, permanent heat, no heat tape; the five required gauge locations; high water level protection on differential vs. low differential valves; priming water and water columning. System size: 60 seconds, 500 gal without a quick-opening device, 750 gal with one, the delivery-time table (1 head/60 s light, 2/50 ordinary, 4/45 extra, 4/40 high piled), test manifolds, and the 15-second dwelling-unit rule. Pipe-volume calculator math, 1/8 in. holes in subdividing check valves, no gridded dry systems, accelerators vs. exhausters. Air and nitrogen: 30-minute restore (60 min below 5°F), 1/2 in. air connection above the priming water, relief valve at least 10 psi over system air (not 50), system air 20 psi over calculated trip, the 5.5 cfm at 10 psi compressor exception, dedicated air maintenance devices, cord-and-plug compressors. Uprights, dry pendents and the 40°F rule, the wet-system barrel-length trap, Minnesota's townhouse-garage dry head within 5 ft of each door. Pitch 1/2 in. and 1/4 in. per 10 ft (1/2 and 1/2 in freezers), aux drains, drum drips (two 1 in. valves and a 2 x 12 in. nipple), 1 in. tie-in drains, the low point drain sign, paddle switches wet-only, trip test connections. Preaction: single interlock, non-interlock, double interlock, 1,000 heads per valve, 500 gal/60 s double interlock sizing, more than 20 heads supervised, 7 psi supervising air, 15 psi relief exception, no gridding, 30 percent design area increase for dry and double interlock. Deluge supervision and calcs, combined pier systems (600/275 heads, two 6 in. valves, 1 minute per 400 ft, 3 minutes max), 3/32 in. freezer check valves. Acceptance: 40 psi air test for 24 hours with 1.5 psi max loss, modification tests (40 psi/2 h/3 psi or 4 hours air off), clapper position, trip test timing, and Minnesota's definition of a trip test as an "inspection" (Minn. R. 7512.0100). Help us get the MN Journeyman Exam Prep Android app out of closed testing: join the tester group at https://groups.google.com/g/mn-journeyman-exam-testers, then opt in at https://play.google.com/apps/testing/com.mnfireexamprep.app.
Embed this episode
No transcript yet.