EP02:甘特图实战
from Hao的游戏PM笔记
本期概要 你用Excel列好了一切,任务清清楚楚,责任人截止日期标得明明白白。但项目进行到一半突然失控,一个看似不起眼的延期像投入水中的石子,涟漪不断扩大,最后整个项目延期,你却不知道问题出在哪。甘特图不是什么新鲜事物,但绝大多数人都用错了。这期不聊怎么画一张"好看"的图,而是聊如何用它做项目管理的"CT扫描",提前预判那些看不见的风险。 在小宇宙查看该单集文稿
Embed this episode
No transcript yet.
Similar podcasts
Frequently asked questions
How long is this episode of Hao的游戏PM笔记?
This episode is 3 minutes long.
When was this Hao的游戏PM笔记 episode published?
This episode was published on January 3, 2026.
Can I download this Hao的游戏PM笔记 episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.