EPISODE · Sep 2, 2021 · 7 MIN
Episode 248 - Wind Turbine Rotor Overspeed at Wind Energy Park
from Path to Warren Podcast · host Matt Warren
In this episode, I share a case study about how a wind turbine was being installed by personnel who were not trained sufficiently in this wind turbine. The turbine rotors spun out of control and fell to the ground causing tons of property damage.
Embed this episode
NOW PLAYING
Episode 248 - Wind Turbine Rotor Overspeed at Wind Energy Park
0:00
7:10
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Path to Warren Podcast?
This episode is 7 minutes long.
When was this Path to Warren Podcast episode published?
This episode was published on September 2, 2021.
Can I download this Path to Warren Podcast episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!