Episode 360: Real Talk 6-27-2026 episode artwork

EPISODE · Jun 27, 2026 · 56 MIN

Episode 360: Real Talk 6-27-2026

from Real Talk with Brad Maaske · host Brad Maaske

There is never enough money for California projects.  A Northern California town is "building" a 1/2 mile long walking trail with a pedestrian bridge over a creek along an existing flat railroad line.  The estimated cost is $21 million and it is expected to take 5 years to complete.  The LAX people mover to get traffic away from the airport is now 3 years past the scheduled completion date and has cost $3,3 billion so far for the 2.25 mile track.  In simple math that is $285,000 per lineal foot.  We discuss all of this and more on this week's Real Talk. 

Episode metadata supplied by the publisher feed · Published Jun 27, 2026

Embed this episode

Ready to play

Episode 360: Real Talk 6-27-2026

0:00 56:30

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Real Talk with Brad Maaske?

This episode is 56 minutes long.

When was this Real Talk with Brad Maaske episode published?

This episode was published on June 27, 2026.

Can I download this Real Talk with Brad Maaske episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!