Episode 6: Standpipes and F*cking Mains (NFPA 14 and 24) episode artwork

EPISODE · Dec 21, 2024 · 30 MIN

Episode 6: Standpipes and F*cking Mains (NFPA 14 and 24)

from MN Journeyman Sprinkler Fitter Exam Prep · host CaseyJames669

Topic: Standpipe systems per NFPA 14 and private fire service mains per NFPA 24. Content: Design, components, and why you need to know about FDC threads and couplings. Focus: How to install and maintain these systems, and static vs residual hydrants.

Episode metadata supplied by the publisher feed · Published Dec 21, 2024

Embed this episode

NOW PLAYING

Episode 6: Standpipes and F*cking Mains (NFPA 14 and 24)

0:00 30:42

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of MN Journeyman Sprinkler Fitter Exam Prep?

This episode is 30 minutes long.

When was this MN Journeyman Sprinkler Fitter Exam Prep episode published?

This episode was published on December 21, 2024.

Can I download this MN Journeyman Sprinkler Fitter Exam Prep episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!