Episode 8: Fire Alarms: No Screwing Around (NFPA 72) episode artwork

EPISODE · Dec 21, 2024 · 17 MIN

Episode 8: Fire Alarms: No Screwing Around (NFPA 72)

from MN Journeyman Sprinkler Fitter Exam Prep · host CaseyJames669

Topic: Fire alarm systems and emergency comms in NFPA 72. [46-51] Content: Alarm types, two-way comms, manual controls, and those damned voice systems. Power and signal times at the supervising station. Focus: Intelligibility of signals and how to document the system.

Episode metadata supplied by the publisher feed · Published Dec 21, 2024

Embed this episode

NOW PLAYING

Episode 8: Fire Alarms: No Screwing Around (NFPA 72)

0:00 17:25

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of MN Journeyman Sprinkler Fitter Exam Prep?

This episode is 17 minutes long.

When was this MN Journeyman Sprinkler Fitter Exam Prep episode published?

This episode was published on December 21, 2024.

Can I download this MN Journeyman Sprinkler Fitter Exam Prep episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!