Floods knocked out Redclyffe, so why rebuild on the same flood-prone site? episode artwork

EPISODE · May 16, 2024 · 29 MIN

Floods knocked out Redclyffe, so why rebuild on the same flood-prone site?

from When the Facts Change · host The Spinoff

The Redclyffe substation near Napier flooded during Cyclone Gabrielle and turning it off turned off the power for much of Hawkes Bay and Tairāwhiti. Transpower has fixed it for now, but has faced a big decision: should it rebuild it where it is now, next to a stream? Or start again on higher ground? The choice tells us a lot about how to think about our climate future. Bernard Hickey talks about that decision with Transpower’s executive general manager grid delivery, Mark Ryall. Learn more about your ad choices. Visit megaphone.fm/adchoices

Episode metadata supplied by the publisher feed · Published May 16, 2024

Embed this episode

NOW PLAYING

Floods knocked out Redclyffe, so why rebuild on the same flood-prone site?

0:00 29:55

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of When the Facts Change?

This episode is 29 minutes long.

When was this When the Facts Change episode published?

This episode was published on May 16, 2024.

Can I download this When the Facts Change episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!