Harvest 2026 is running behind schedule episode artwork

EPISODE · Sep 19, 2026 · 1 MIN

Harvest 2026 is running behind schedule

from Rural Roots Canada · host RRC soundbites

Harvest is running well behind schedule across Alberta and B.C., but warmer and dryer weather is on the way this autumn. RRC Meteorologist David Spence has the details.

Episode metadata supplied by the publisher feed · Published Sep 19, 2026

Embed this episode

Ready to play

Harvest 2026 is running behind schedule

0:00 1:29

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Rural Roots Canada?

This episode is 1 minute long.

When was this Rural Roots Canada episode published?

This episode was published on September 19, 2026.

Can I download this Rural Roots Canada episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!