【加更】EP11:美术进度管理-看着快完了,其实还早 episode artwork

EPISODE · Jan 19, 2026 · 3 MIN

【加更】EP11:美术进度管理-看着快完了,其实还早

from Hao的游戏PM笔记

内容概览: 进度误判的四个坑(完成度陷阱、返工、最后10%、假并行) 三个跟踪方法(工序拆分、盯卡住任务、里程碑倒推) 进度会议怎么开、汇报话术 发现问题后的处理选项 实操练习在小宇宙查看该单集文稿

Episode metadata supplied by the publisher feed · Published Jan 19, 2026

Embed this episode

Ready to play

【加更】EP11:美术进度管理-看着快完了,其实还早

0:00 3:00

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Hao的游戏PM笔记?

This episode is 3 minutes long.

When was this Hao的游戏PM笔记 episode published?

This episode was published on January 19, 2026.

Can I download this Hao的游戏PM笔记 episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!