Maxter Healthcare’s $500M Reshoring Bet: Building America’s First Nitrile Glove Mega-Facility in Brazoria County, Texas episode artwork

EPISODE · Jun 2, 2026 · 44 MIN

Maxter Healthcare’s $500M Reshoring Bet: Building America’s First Nitrile Glove Mega-Facility in Brazoria County, Texas

from U.S. Manufacturing Today · host Veryable, Inc.

Matt Horine interviews Maxter Healthcare leaders Kevin Shutack, Nick Gilman, and Donny Chan about Master Healthcare's $500 million investment to build its first US nitrile glove manufacturing facility in Brazoria County, Texas, aimed at strengthening domestic PPE supply chain resilience after COVID-19 shortages. They explain why the pandemic accelerated a long-held vision, how site selection prioritized water, power, weather, logistics, and community after evaluating locations including Upstate New York and Florida, and why Brazoria County won. The guests describe the 215-acre, highly automated, hurricane- and flood-resilient plant using AI defect detection and producing 180–200 million gloves monthly today, with phase-one capacity rising and long-term plans for up to ~80 lines. They discuss serving healthcare, industrial, and federal government demand, policy signals, tariffs and raw-material challenges, and the push for long-term contracts to reduce import volatility and shortages.00:00 Welcome and Episode Setup01:47 Why Reshore Gloves Now03:36 Site Search Across States06:51 Choosing Brazoria County Texas09:46 Markets and Federal Demand12:25 Policy Tariffs and Supply Risks18:05 Inside the Mega Facility20:44 How Gloves Are Made at Scale26:10 Winning Buyers on Value29:52 Expansion Plans and Contracts34:24 Supply Chain Disruptions Return39:49 Advice for Onshoring Builders42:25 Where to Learn More43:12 Closing Takeaways and OutroLinksMaxter Healthcare⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠Navigating Trump 2.0 ⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠Revitalizing US Manufacturing⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠⁠Sign Up on the Veryable Platform ⁠

Episode metadata supplied by the publisher feed · Published Jun 2, 2026

Embed this episode

Ready to play

Maxter Healthcare’s $500M Reshoring Bet: Building America’s First Nitrile Glove Mega-Facility in Brazoria County, Texas

0:00 44:37

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of U.S. Manufacturing Today?

This episode is 44 minutes long.

When was this U.S. Manufacturing Today episode published?

This episode was published on June 2, 2026.

Can I download this U.S. Manufacturing Today episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!