Obstructions Installed Entirely Below Sprinklers (The 4-Foot Rule for Overhead Ducts, Decks, and Trays) episode artwork

EPISODE · Jul 25, 2026 · 37 MIN

Obstructions Installed Entirely Below Sprinklers (The 4-Foot Rule for Overhead Ducts, Decks, and Trays)

from MN Journeyman Sprinkler Fitter Exam Prep · host CaseyJames669

Look, every greenhorn on the job thinks if a sheet metal HVAC duct is hanging a couple of feet below the branch line, they can just run their pipe over top of it and call it a day. Then they take the Minnesota Journeyman Exam, get slapped with a question about a 4-foot-2-inch supply duct, and burn three easy points because they answered based on what their lazy jobsite foreman told them on a Friday afternoon. Today we’re tearing down NFPA 13 Section 8.6.5.3.1 so you don't choke on this exact trap when the state examiner grades your test.

Episode metadata supplied by the publisher feed · Published Jul 25, 2026

Embed this episode

NOW PLAYING

Obstructions Installed Entirely Below Sprinklers (The 4-Foot Rule for Overhead Ducts, Decks, and Trays)

0:00 37:33

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of MN Journeyman Sprinkler Fitter Exam Prep?

This episode is 37 minutes long.

When was this MN Journeyman Sprinkler Fitter Exam Prep episode published?

This episode was published on July 25, 2026.

Can I download this MN Journeyman Sprinkler Fitter Exam Prep episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!