Peninsula Energy (ASX:PEN) - Resurging With 2024 US Uranium Production Plans episode artwork

EPISODE · Jan 12, 2024 · 23 MIN

Peninsula Energy (ASX:PEN) - Resurging With 2024 US Uranium Production Plans

from Company Interviews · host Crux Investor

Interview with Wayne Heili, MD of Peninsula Energy Ltd.Our previous interview: https://www.cruxinvestor.com/posts/peninsula-energy-asxpen-this-is-a-better-solution-3815Recording date: 11th January 2024Peninsula Positions for Uranium Resurgence With 2024 Production PlansAustralian uranium developer Peninsula Energy (OTCQB:PENMF) believes it has addressed the challenges that hindered its production plans in 2023 and can now fast-track efforts to join the ranks of uranium suppliers by late 2024. The company is completing construction of a processing facility at its Lance project in the U.S. to produce yellowcake from an in-situ recovery (ISR) operation in Wyoming. Peninsula aims to ramp up to an initial production rate of 2 million pounds U3O8 per year.According to CEO Wayne Heili, securing their own backend capability after originally planning for toll processing will enable Peninsula to reduce costs and more than double targeted output relative to the prior satellite approach. The decision did push back first production, but the extended timeline may prove fortuitous if uranium markets continue recent strength.Following an institutional placement and share purchase plan raising A$60 million, Heili confirmed Peninsula now has adequate funding to finish plant modifications and infrastructure at Lance to achieve production in 2024. The company also structured additional financing options potentially worth around A$40 million to provide further support for the ramp-up phase if required.Importantly, Peninsula Energy has substantial existing contract coverage inherited from the project’s prior owners that will help de-risk early operations. However, with only about one-third of the expanded production capacity spoken for so far, the company retains significant exposure to rising spot and term prices expected due to uranium’s structural supply deficit.Heili points to U.S. policies around Russian uranium imports, renewed buying from the Sprott Physical Uranium Trust, and widening supply/demand imbalances as providing multi-year tailwinds. With mines unable to keep pace with reactor requirements globally, he suggests the market could retest all-time highs above $130 per pound in 2024. That would be a major boon for Peninsula coming online.The Lance ISR technique itself is proven technology, having operated previously, and Heili expressed confidence in bringing production back given his team’s expertise. While timing may trail some other projects, Peninsula anticipates having lower costs than most at around $50 per pound. Thus, profit margins look attractive even on existing contract rates assumed to average $60 to $70.With Peninsula clearing obstacles that distorted its outlook a year ago, investors now have improved visibility on the company’s capability to deliver yellowcake into a strengthening market. The strategic move to control its own backend processing de-risks operations and allows increased scale. Heili contends that with all key pieces in place, “2024 is about execution and getting the construction done and ready for production.” The coming 18 months will demonstrate whether Peninsula can fulfill its production promises to shareholders.—View Peninsula Energy's company profile: https://www.cruxinvestor.com/companies/peninsula-energySign up for Crux Investor: https://cruxinvestor.com

Interview with Wayne Heili, MD of Peninsula Energy Ltd.Our previous interview: https://www.cruxinvestor.com/posts/peninsula-energy-asxpen-this-is-a-better-solution-3815Recording date: 11th January 2024Peninsula Positions for Uranium Resurgence With 2024 Production PlansAustralian uranium developer Peninsula Energy (OTCQB:PENMF) believes it has addressed the challenges that hindered its production plans in 2023 and can now fast-track efforts to join the ranks of uranium suppliers by late 2024. The company is completing construction of a processing facility at its Lance project in the U.S. to produce yellowcake from an in-situ recovery (ISR) operation in Wyoming. Peninsula aims to ramp up to an initial production rate of 2 million pounds U3O8 per year.According to CEO Wayne Heili, securing their own backend capability after originally planning for toll processing will enable Peninsula to reduce costs and more than double targeted output relative to the prior satellite approach. The decision did push back first production, but the extended timeline may prove fortuitous if uranium markets continue recent strength.Following an institutional placement and share purchase plan raising A$60 million, Heili confirmed Peninsula now has adequate funding to finish plant modifications and infrastructure at Lance to achieve production in 2024. The company also structured additional financing options potentially worth around A$40 million to provide further support for the ramp-up phase if required.Importantly, Peninsula Energy has substantial existing contract coverage inherited from the project’s prior owners that will help de-risk early operations. However, with only about one-third of the expanded production capacity spoken for so far, the company retains significant exposure to rising spot and term prices expected due to uranium’s structural supply deficit.Heili points to U.S. policies around Russian uranium imports, renewed buying from the Sprott Physical Uranium Trust, and widening supply/demand imbalances as providing multi-year tailwinds. With mines unable to keep pace with reactor requirements globally, he suggests the market could retest all-time highs above $130 per pound in 2024. That would be a major boon for Peninsula coming online.The Lance ISR technique itself is proven technology, having operated previously, and Heili expressed confidence in bringing production back given his team’s expertise. While timing may trail some other projects, Peninsula anticipates having lower costs than most at around $50 per pound. Thus, profit margins look attractive even on existing contract rates assumed to average $60 to $70.With Peninsula clearing obstacles that distorted its outlook a year ago, investors now have improved visibility on the company’s capability to deliver yellowcake into a strengthening market. The strategic move to control its own backend processing de-risks operations and allows increased scale. Heili contends that with all key pieces in place, “2024 is about execution and getting the construction done and ready for production.” The coming 18 months will demonstrate whether Peninsula can fulfill its production promises to shareholders.—View Peninsula Energy's company profile: https://www.cruxinvestor.com/companies/peninsula-energySign up for Crux Investor: https://cruxinvestor.com

NOW PLAYING

Peninsula Energy (ASX:PEN) - Resurging With 2024 US Uranium Production Plans

0:00 23:27

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

French Your Way Jessica: Native French teacher founder of French Your Way Boost your French listening skills and test your comprehension with this one of a kind series of podcasts. Get the chance to listen to a real conversation between native speakers talking at normal speed AND customise your learning experience through carefully designed sets of questions (2 levels of difficulty) available for download at www.frenchvoicespodcast.com. All interviews also come with the transcript. French teacher Jessica interviews native speakers of French from around the world who share a bit of their life and passion. Where else would you meet in one same place a French yoga teacher based in Melbourne, a soap manufacturer from Provence, or a couple cycling around the world? That Hoarder: Overcome Compulsive Hoarding That Hoarder Hoarding disorder is stigmatised and people who hoard feel vast amounts of shame. This podcast began life as an audio diary, an anonymous outlet for somebody with this weird condition. That Hoarder speaks about her experiences living with compulsive hoarding, she interviews therapists, academics, researchers, children of hoarders, professional organisers and influencers, and she shares insight and tips for others with the problem. Listened to by people who hoard as well as those who love them and those who work with them, Overcome Compulsive Hoarding with That Hoarder aims to shatter the stigma, share the truth and speak openly and honestly to improve lives. LIGHTS, CAMERA, SMILE! Creatives Club Media Lights, Camera, Smile, is a podcast for anyone with a dream to share something with the world, out of the overflow of themselves - be it their mind, their heart, their personalities, and much more. Each of us are alive in this moment in time, with an innate ability to have ideas and create various things to benefit both ourselves and the people around us for a reason, and here, you will find the encouragement, the inspiration, and the motivation to do just that. Hosted by Cicily, founder of Creatives Club, she dives into various topics surrounding creativity and business. Exploring entrepreneurship for creatives in a corporate reality, sharing tips and tricks in a media centered company, answering questions regarding what a creative actually is are just a few of the things discussed on this podcast. Be encouraged to create for yourself as Cicily gets vulnerable by pivoting the camera to herself for the first time.To submit questions for Cicily to answer, or have her address certain t The Lee Olsen Show Lee Olsen CJF I want to help you improve all areas of your life by 3 types of podcasts!👉Blood, Sweat & Blessings-Interviews of normal people that have achieved BIG things!👉Series!!! For Love of the Horse- Brad Jackman DVM & Lee Olsen CJF, how to help your horse!👉Business Tips- Proven Life Changing Business Strategies with Lee Olsen

Frequently Asked Questions

How long is this episode of Company Interviews?

This episode is 23 minutes long.

When was this Company Interviews episode published?

This episode was published on January 12, 2024.

What is this episode about?

Interview with Wayne Heili, MD of Peninsula Energy Ltd.Our previous interview: https://www.cruxinvestor.com/posts/peninsula-energy-asxpen-this-is-a-better-solution-3815Recording date: 11th January 2024Peninsula Positions for Uranium Resurgence With...

Can I download this Company Interviews episode?

Yes, you can download this episode by clicking the download button on the episode player, or subscribe to the podcast in your preferred podcast app for automatic downloads.
URL copied to clipboard!