Plans for two new tunnels in Wellington to cost $4 billion episode artwork

EPISODE · Nov 16, 2025 · 3 MIN

Plans for two new tunnels in Wellington to cost $4 billion

from Midday Report

Plans for two new tunnels for Wellington's SH1 have been revealed with a total cost of up to $4 billion. Wellington's Mayor Andrew Little spoke to Charlotte Cook.

Episode metadata supplied by the publisher feed · Published Nov 16, 2025

Embed this episode

NOW PLAYING

Plans for two new tunnels in Wellington to cost $4 billion

0:00 3:45

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of Midday Report?

This episode is 3 minutes long.

When was this Midday Report episode published?

This episode was published on November 16, 2025.

Can I download this Midday Report episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!