EPISODE · Nov 16, 2025 · 3 MIN
Plans for two new tunnels in Wellington to cost $4 billion
from Midday Report
Plans for two new tunnels for Wellington's SH1 have been revealed with a total cost of up to $4 billion. Wellington's Mayor Andrew Little spoke to Charlotte Cook.
Embed this episode
NOW PLAYING
Plans for two new tunnels in Wellington to cost $4 billion
0:00
3:45
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Midday Report?
This episode is 3 minutes long.
When was this Midday Report episode published?
This episode was published on November 16, 2025.
Can I download this Midday Report episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!