Podcast: Melissa Gibson | Michelle Long, Leading Lady of Localism episode artwork

EPISODE · Aug 13, 2016 · 17 MIN

Podcast: Melissa Gibson | Michelle Long, Leading Lady of Localism

from BEST SELF MAGAZINE · host Holistic Health & Conscious Living

Melissa Gibson interviews Michelle Long, a champion of localism, local economies and values-driven enterprise as keys to a strong economy.

Episode metadata supplied by the publisher feed · Published Aug 13, 2016

Embed this episode

NOW PLAYING

Podcast: Melissa Gibson | Michelle Long, Leading Lady of Localism

0:00 17:07

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of BEST SELF MAGAZINE?

This episode is 17 minutes long.

When was this BEST SELF MAGAZINE episode published?

This episode was published on August 13, 2016.

Can I download this BEST SELF MAGAZINE episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!