Skip to content
Replacing a Road Sign with Four-Point Tracking episode artwork

EPISODE · Oct 31, 2013 · 9 MIN

Replacing a Road Sign with Four-Point Tracking

from Smoke Learning Channel · host Autodesk

Part 5 shows the four corner pinning and four corner tracking workflow. This workflow is typically used for screen replacements and replacing boards or signs.

Episode metadata supplied by the publisher feed · Published Oct 31, 2013

Embed this episode

Ready to play

Replacing a Road Sign with Four-Point Tracking

0:00 9:12

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

Frequently Asked Questions

How long is this episode of Smoke Learning Channel?

This episode is 9 minutes long.

When was this Smoke Learning Channel episode published?

This episode was published on October 31, 2013.

Can I download this Smoke Learning Channel episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!