Skip to content
The Lender’s AIA Guide episode artwork

Aug 5, 2026 42 min

The Lender’s AIA Guide

from The Construction Lending Podcast Hosted by Land Gorilla

G702s, Modifications, and the Loan Gap The construction agreement between your borrower and their general contractor was negotiated and signed before your institution ever saw it — and the documents driving your draw process, like the G702 and G703 payment applications, trace back to a standardization effort that began in the late 1800s.

Episode details come from the podcast's RSS feed.

Embed this episode

Ready to play

The Lender’s AIA Guide

0:00 42:06

No transcript yet.

Requests help us decide what to transcribe next.

Frequently asked questions

How long is this episode of The Construction Lending Podcast?

This episode is 42 minutes long.

When was this The Construction Lending Podcast episode published?

This episode was published on August 5, 2026.

Can I download this The Construction Lending Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.