EPISODE · Mar 9, 2023 · 4 MIN
Transmissienetwerk: Eskom wíl bou, maar grondregte sukkel
from Maroela Media Nuus · host Maroela Media
Nuwe transmissielyne is dringend nodig om ʼn toename in beskikbare krag behoorlik te herlei, maar Eskom sukkel tot tien jaar lank om grondregte hiervoor te bekom, sê Ronald Marais van die kragverskaffer. Maroela Media Nuus
Embed this episode
Ready to play
Transmissienetwerk: Eskom wíl bou, maar grondregte sukkel
0:00
4:05
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
No similar podcasts found.
Frequently Asked Questions
How long is this episode of Maroela Media Nuus?
This episode is 4 minutes long.
When was this Maroela Media Nuus episode published?
This episode was published on March 9, 2023.
Can I download this Maroela Media Nuus episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!