Vertical MRO Alerts: By Bell - Episode 4: Bell 407 Tailboom Hardware & Fittings – Inspection of episode artwork

EPISODE · May 6, 2025 · 14 MIN

Vertical MRO Alerts: By Bell - Episode 4: Bell 407 Tailboom Hardware & Fittings – Inspection of

from The Vertical MRO Podcast · host Val Medved

Welcome to Vertical MRO Alerts, presented by Bell!407-24-134 Tailboom Attachment Hardware and Fittings, Inspection OfIn this episode, hosts Marc Dubé and Gilbert Gaudreault, technical experts on the Bell Product Support Engineering (PSE) Team, share insights into recently released Alert Service Bulletin (ASB) regarding the inspection of the attachment hardware and fittings for the tailboom junction which impacts the Bell 407 model.We want to hear from you! - [email protected] help with your Bell helicopter? - [email protected]

Episode metadata supplied by the publisher feed · Published May 6, 2025

Embed this episode

NOW PLAYING

Vertical MRO Alerts: By Bell - Episode 4: Bell 407 Tailboom Hardware & Fittings – Inspection of

0:00 14:13

No transcript for this episode yet

We transcribe on demand. Request one and we'll notify you when it's ready — usually under 10 minutes.

No similar episodes found.

No similar podcasts found.

Frequently Asked Questions

How long is this episode of The Vertical MRO Podcast?

This episode is 14 minutes long.

When was this The Vertical MRO Podcast episode published?

This episode was published on May 6, 2025.

Can I download this The Vertical MRO Podcast episode?

Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!