EPISODE · Mar 6, 2026 · 14 MIN
View From Victoria: Wastewater treatment facility drama continues
from Mornings with Simi · host Curiouscast
The fallout continues from from the recent Musqueam agreement. Premier David Eby’s own credibility is under fire too. The drama surrounding the North Vancouver Wastewater Treatment facility never seems to end. Guest: Vaughn Palmer Learn more about your ad choices. Visit megaphone.fm/adchoices
Embed this episode
NOW PLAYING
View From Victoria: Wastewater treatment facility drama continues
0:00
14:22
1×
No transcript for this episode yet
Similar Episodes
No similar episodes found.
Similar Podcasts
Frequently Asked Questions
How long is this episode of Mornings with Simi?
This episode is 14 minutes long.
When was this Mornings with Simi episode published?
This episode was published on March 6, 2026.
Can I download this Mornings with Simi episode?
Yes. Use the download control on the episode player to save the publisher-provided media file.
URL copied to clipboard!