Efficiency and Reliability Audio Case Studies cover art

All Episodes

Efficiency and Reliability Audio Case Studies — 60 episodes

#
Title
1

EPISODE 60 - Integrated Global Services Announces Acquisition of Flamsprutarna AB

2

EPISODE 59 - Restoring SCR Performance at Apex Four Corners Power Station

3

EPISODE 58 - How a Large Refinery Achieved 9.8% Fuel Savings Through Fired Heater Optimization podcast

4

EPISODE 57 - Restoring Reliability in a Supercritical CFB Unit

5

EPISODE 56 - HVTS in Offshore Service: Slug Catcher Corrosion Case Study

6

EPISODE 55 - Stripper Tower H2S & HCl Corrosion Protection at Gulf Coast Refinery

7

EPISODE 54 - Refinery Tackles Declining Furnace Performance and Rising Stack Temperatures Without Shutdown

8

EPISODE 53 - Extending Reactor Lifespan with Targeted Cladding Solutions

9

EPISODE 52 - What is Asset Vitality?

10

EPISODE 51 - How a Canadian Refinery Overcame Metallurgy Challenges in Renewables Conversion

11

EPISODE 50 - Recurring Corrosion Damage Threatens Amine Still Tower Integrity

12

EPISODE 49 - Cleaning Fouled Convection Tubes at a US Methanol Plant

13

EPISODE 48 - Addressing Amine Stress Cracking in Critical Equipment

14

EPISODE 47 - Improving Radiant Tube Life and Efficiency at an Aromatics Plant with Ceramic Coating

15

EPISODE 46 - HVTS® Protects Critical Refinery Assets Saving 10–12 Days of TA Time

16

EPISODE 45 - How to Address Scaling and Efficiency Challenges in an Aromatics Plant

17

EPISODE 44 - High-Temperature Corrosion Issues in a GE 7HA Gas Turbine

18

EPISODE 43 - Severe Corrosion Threatens Biomass Boiler Reliability

19

EPISODE 42 - How a Metallurgy Upgrade Restored a Fractionation Column

20

EPISODE 41 - How a Petrochemical Plant Avoided $12 Million in Losses

21

EPISODE 40 - Improving Boiler Reliability at a Texas Power Plant

22

EPISODE 39 - Performance Improvements with IGS Cetek Coatings

23

EPISODE 38 - How Cement Plants Improve Efficiency with Air Cannon Multipier System

24

EPISODE 37 - Improving Boiler Efficiency and Longevity with HVTS Cladding

25

EPISODE 36 - How Fireside Ceramic Coatings Imrpove Thermal Spray Performance

26

EPISODE 35 - Improving Cement Production with IGS Air Cannons and Multipliers

27

EPISODE 34 - Advanced Solutions for Pipeline Corrosion Control in the Energy Industry

28

EPISODE 33 - Importance of High Emissivity Coating Durability for Fired Heaters

29

EPISODE 32 - IGS's Role in the Success of the Ras Tanura Refinery Turnaround

30

EPISODE 31 - Addressing Furnace Efficiency Loss from Convection Section Fouling

31

EPISODE 30 - Optimizing Vacuum Heater Systems: Tackling Tube Coking and Phase Separation Challenges

32

EPISODE 29 - Comparing Performance: Initial Coating vs. IGS Solution

33

EPISODE 28 - Overcoming Persistent Erosion and Costly Shutdowns in a Petrochemical Plant

34

EPISODE 27 - Technology Advancements on Efficiency and Reliability Solutions

35

EPISODE 26 - Nugen Energy's Refractory Failure Challenge

36

EPISODE 25 - Texas Tower Cleaning Enables IRIS Inspection and Saves $8Mil+

37

EPISODE 24 - Solving Fired Heater Radiant Tube Oxidation

38

EPISODE 23 - Erosion and Corrosion in Waste Heat Recovery Systems

39

EPISODE 22 - Robotic Solutions: Enhancing Efficiency in Petrochemical Operations

40

EPISODE 21 - Hydrotreater Efficiency Increase During Turnaround

41

EPISODE 20 - Corrosion Challenges in Japanese Refineries

42

EPISODE 19 - Sulfolane Corrosion Prevention with On-site Alloy Upgrade During Turnaround

43

EPISODE 18 - Solving Coating Issues in a Carbon Capture and Storage Project Amidst New Year Holidays

44

EPISODE 17 - Catalytic Reformer Audits: 13.5% Furnace Efficiency Increase

45

EPISODE 16 - Ethylene Cracking Furnace Hot Spot Repair Online

46

EPISODE 15 - How a Pulp and Paper CFB Boiler Mitigated Extreme Erosion and Saved Long-Term Costs

47

EPISODE 14 - How Can Refineries Cut Costs And Reduce Fuel Use In Their Catalytic Reforming Unit Fired Heaters

48

EPISODE 13 - How a Plant Stopped CFB Boiler Tube Repairs From 500 To 0

49

EPISODE 12 - HVTS Eliminates Waste Heat Recovery Boiler Corrosion at Copper Smelter

50

EPISODE 11 - Furnace Hot Spot Repair in the Live Tail Gas Incinerator Saves $156 Million

51

EPISODE 10 - Autoclave Lining Repair at a Copper Facility

52

EPISODE 9 - IGS Addressed a Process Vessel Emergency on Christmas Eve

53

EPISODE 8 - Mitigating Erosion: HVTS Cladding Solution for QAPCO Quench Column

54

EPISODE 7 - Successful Revamp of a 40-year-old Steam-Methane Reformer Furnace

55

EPISODE 6 - Tube Tech Increases Thermal Efficiency by 3% at Tüpraş Izmir Refinery in Turkey

56

EPISODE 5 - IGS ClearStream Chromium-6 Filtration for Safe HVTS Application

57

EPISODE 4 - SMARTGard HVTS Solution: Pulp Mill CFB Boiler Goals Achieved

58

EPISODE 3 - Larry Emch from IGS: Energy Efficiency in Furnaces

59

EPISODE 2 - Overcoming Severe Refractory Failure in a Saudi Arabian Refinery

60

EPISODE 1 - SS Chloride Stress Corrosion Cracking in Critical Process Assets